Laserfiche WebLink
aPPS �N•o} Ty`,m U. S. DEPT. OF THE INTERIOR lNT O�F �p <br /> �} a OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT o <br /> -� a9 Mine-Site Evaluation Inspection Report <br /> 10. Type <br /> 1. Pennittee/Person 9. Permit Number a.Permit b.RA <br /> MID-CONTINENT RESOURCES I C-81-017 NP RS <br /> 2. Address 11. Inspection Date 12. Inspection Type 13. Joint Inspection <br /> PO BOX 1298 07/07/93 CC �Y YIN <br /> MM - DD - YY <br /> 3. City 4. State 14. Permit Status 15. Site Status 16. Facility Type <br /> GLENWOOD SPR. CO BF FP <br /> 5. Zip Code '6. Phone Number 17. OSM Office# 18. RSI# 19. Land Code <br /> 81602 -� 020 FS <br /> 7. Operator if Different than Permittee 20. M.S.H.A.ID# 21. State Code 22. County Code <br /> PITKIN IRON CO 05-00469 I 08 097 <br /> 8. Mine Name 23. AVS Permittee Entity ID Number <br /> COAL BASIN 091955 <br /> C <br /> 24. Performance Standard Categories <br /> Codes: 1=Com liance 2=Noncom liance 3=Not Plana 4=Not S =Noncom liance Identified Elsewhere <br /> A. Administrative D. Backfilling& Grading H._Subsidence Control Plan <br /> I.-Mining within Valid Permit I.-Exposed Openings I. Roads <br /> 2.-Mining within Bonded Area 2.-Contemporaneous Reclamation I.-Road Construction <br /> 3.-Terms&Conditions of Permit 3.-Approximate Original Contour 2.-Certification <br /> 4._Liability Insurance 4._Highwall Elimination 3. 2 Drainage <br /> 5._Ownership and Control 5._Steep Slopes(includes downslope) 4.-Surfacing and Maintenance <br /> 6._Temporary Cessation 6._Handling of Acid&Toxic Materials 5._Reclamation <br /> B. Hydrologic Balance 7._Stabilization(rills and gullies) <br /> 1. 2 Drainage Control E. Excess Spoil Disposal J. Signs&Markers <br /> 2._Inspections&Certifications I.-Placement I.-Signs <br /> 3.-Siltation Structures 2._Drainage Control 2.-Markers <br /> 4. Discharge Structures 3._Surface Stabilization K. Distance Prohibitions <br /> 5. 2 Diversions 4._Inspections&Certifications <br /> 6._Effluent Limits L. Revegetation <br /> 7._Ground Water Monitoring F. Coal Mine Waste I.-Vegetative Cover <br /> 8._Surface Water Monitoring (Refuse Piles/Impoundments) 2.-Timing <br /> 9._Drainage--Acid-Toxic Materials 1. 2 Drainage Control <br /> 10. Impoundments 2.-Surface Stabilization M._Postmining Land Use <br /> I I.-Stream Buffer Zones 3.-Placement <br /> 4._Inspections and Certifications N. Other <br /> C. Topsoil& Subsoil 5._Impounding Structures <br /> 1. Removal G. Use Of Explosives 2 1) DEPRESSIONS <br /> I Substitute Materials I.-Blaster Certification <br /> 3.-Storage and Protection 2. Distance Prohibitions -2) <br /> 4.-Redistribution 3. Blast Survey/Schedule _3) <br /> 4.-Warnings&Records <br /> 5. Control of Adverse Effects <br /> 25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br /> a Date of Last a.Total <br /> State Complete 03/30/93 2.0 a.Permit Review 333.0 bonded <br /> Inspection 0.0 a permitted <br /> Frequency for previous 4 Calendar Qtrs. b.Phase I <br /> b Number of Number of 4.5 b.Inspection Time 0.0 released b.Disturbed <br /> required complete 333.0 <br /> complete 4 inspections3 c.Phase II (Estimated) <br /> inspections conducted 5.0 0.0 released <br /> c Number of Number of c.Travel Time <br /> required partial d.Phase III <br /> partial g m rtial ns 8 5.0 d.Report Writin 0'0 released Page 1 of inspections conducted epo g <br />