Laserfiche WebLink
o q. r. ,. <br /> ' ENTOFly N10Fj, <br /> U. S. DEPT. OF THE INTERIOR <br /> JOD OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT o ao�gav <br /> Mine-Site Evaluation Inspection ReportF� <br /> CH 1 <br /> 10. Type <br /> 1. Permittee/Person 9. Permit Number a.Permit b.RA <br /> MID CONTINENT RESOURCES C-81-017 NP [8 <br /> 2. Address 11. Inspection Date 12. Inspection Type 13. Joint Inspection <br /> PO BOX 1298 07/23/93 FF �N YIN <br /> mm - vv - rr <br /> 3. City 4. State 14. Permit Status 15. Site Status 16. Facility Type <br /> GLENWOOD SPR. CO BF FP [B <br /> 5. Zip Code 6. Phone Number 17. OSM Office# 18. RSI# 19. Land Code <br /> 81602 - 020 <br /> 7. Operator if Different than Permittee 20. M.S.H.A.ID# 21. State Code 22. County Code <br /> PITKIN IRON CO 1 05-00469 OS 097 <br /> 8. Mine Name 23. AVS Permium Entity ID Number <br /> COAL BASIN 1 091955 <br /> 24. Performance Standard Categories <br /> Codes: 1=Coin liance 2=Noncom licence S=Not Plana 4=Not S =Noncom liance Identified Elsewhere <br /> A. Administrative D. Backfilling&Grading H._Subsidence Control Plan <br /> I.-Mining within Valid Permit I.- <br /> _Exposed Openings I. Roads <br /> 2.-Mining within Bonded Area 2_Contemporaneous Reclamation 1. Road Construction <br /> 3.-Terms&Conditions of Permit 3_Approximate Original Contour 2, Certification <br /> 4.-Liability Insurance 4._Highwall Elimination 3.=Drainage <br /> 5._Ownership and Control 5_Steep Slopes(includes downslope) 4. Surfacing and Maintenance <br /> 6._Temporary Cessation 6._Handling of Acid&Toxic Materials 5._Reclamation <br /> B. Hydrologic Balance 7._Stabilization(rills and gullies) <br /> 1. Drainage Control E. Excess Spoil Disposal J. Signs&Markers <br /> 1 <br /> 2. Inspections&Certifications 1. Placement 1. Signs <br /> 3.-Siltation Structures 2.-Drainage Control 2.-Markers <br /> 4.-Discharge Structures 3. Surface Stabilization K. Distance Prohibitions <br /> 5._Diversions 4._Inspections&Certifications <br /> 6._Effluent Limits L. Revegetation <br /> 7._Ground Water Monitoring F. Coal Mine Waste I.-Vegetative Cover <br /> 8. Surface Water Monitoring (Refuse Piles/Impoundments) 2.-Timing <br /> 9.__Drainage--Acid-Toxic Materials 1._Drainage Control <br /> 10._Impoundments 2._Surface Stabilization M._Postmining Land Use <br /> 11. 2 Stream Buffer Zones 3.-Placement <br /> 4._Inspections and Certifications N. Other <br /> C. Topsoil&Subsoil 5._Impounding Structures <br /> I.-Removal G. Use Of Explosives -1) <br /> 2.-Substitute Materials I.-Blaster Certification <br /> 3.-Storage and Protection 2. Distance Prohibitions -2) <br /> 4.-Redistribution 3.-Blast Survey/Schedule <br /> 4.-Warnings&Records -3) <br /> 5. Control of Adverse Effects <br /> 25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br /> a Date of last a.Total <br /> State Complete d 03/30/93 1.0 a.Permit Review 333.0 bonded 0.0 a.Permitted <br /> Frequency for previous 4 Calendar Qtrs. b.Phase I <br /> b.Number of Numberof 1.0 0.0 released <br /> b.Inspection Time <br /> required complete 333.0 b.Disturbed <br /> complete � inspections conducted <br /> p❑ c.Phase lI (Estimated) <br /> inspections conducted <br /> c.Number of Number of 7'0 c.Travel Time 0.0 released <br /> required partial d.Phase III <br /> Inspections� �� 0❑ 4.0 d.Report Writing 0.0 released Page 1 of <br />