My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (136)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (136)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 7:24:56 AM
Creation date
10/17/2012 11:26:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�EMr OFT ENT OF lyFi <br /> U. S. DEPT. OF THE INTERIOR y�" "po <br /> g OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT o <br /> �4R _,ga9 Mine-Site Evaluation Inspection Report O�OFSURFA <br /> CH y GF��2 <br /> Citizen Complaint ID# CC93-020-010 10. Type <br /> 1. Permittee/Person 9. Permit Number a.Permit b.RA <br /> MID-CONTINENT RESOURCES I I-017-81 PP RS <br /> 2. Address 11. Inspection Date 12. Inspection Type 13. Joint Inspection <br /> do LEW THOMPSON, 12/10/93 CCR aN YIN <br /> MM - DD - YY <br /> 3. City 4. State 14. Permit Status 15. Site Status 16. Facility Type <br /> CARBONDALE CO [i�] ** F <br /> 5. Zip Code 6. Phone Number 17. OSM Office# 18. RSI# 19. Land Code <br /> 81623 - 1 303-963-2581 020 FS <br /> 7. Operator if Different than Permittee 20. M.S.H.A.ID# 21. State Code 22. County Code <br /> i W"'-'_ ' OS-02342 1 08 097 <br /> 8. Mine Name 23. AVS Permittee Entity ID Number 23b. State Office <br /> COAL BASIN 091955 <br /> 24. Performance Standard Categories <br /> Codes: 1=Com licence 2=Noncom liance 3=Not Plana 4=Not S =Noncom licence Identified Elsewhere <br /> A. Administrative D. Backfilling&Grading H.-Subsidence Control Plan <br /> 1.-Mining within Valid Permit 1. Exposed Openings I. Roads <br /> 2._Kning within Bonded Area 2. 2 Contemporaneous Reclamation 1. Road Construction <br /> 3.-Terms&Conditions of Permit 3.--Approximate Original Contour 2.-Certification <br /> 4.-Liability Insurance 4._Highwall Elimination 3. Drainage <br /> 5._Ownership and Control _ 5._Steep Slopes_(includes downslo ep ) 4.-Surfacing and Maintenance - <br /> 6._Tempotary Cessation 6._Handling of Acid&Toxic Materials- 5. Reclamation <br /> B. Hydrologic Balance 7._Stabilization(rills and gullies) - <br /> 1.-Drainage Control E. Excess Spoil Disposal J. Signs&Markers <br /> 2._Inspections&Certifications 1. Placement I.-Signs <br /> 3.-Siltation Structures 2._Drainage Control 2.-Markers <br /> 4.-Discharge Structures 3. Surface Stabilization K. Distance Prohibitions <br /> 5._Diversions 4. inspections&Certifications - <br /> 6._Effluent Limits L. Revegetation <br /> 7.-Ground Water Monitoring F. Coal Mine Waste I.-Vegetative Cover <br /> 8._Surface Water Monitoring (Refuse Piles(Impoundments) 2.-Timing <br /> 9._Drainage--Acid-Toxic Materials 1._Drainage Control <br /> 10._Impoundments 2.-Surface Stabilization M.-Postmining Land Use <br /> I I.-Stream Buffer Zones 3_Placement <br /> 4.-Inspections and Certifications N. Other <br /> C. Topsoil&Subsoil 5.-Impounding Structures <br /> 1._Removal G. Use of Explosives -1) <br /> 2.-Substitute Materials 1. Blaster Certification <br /> 3.-Storage and Protection 2. Distance Prohibitions -2) <br /> 4.-Redistribution 3. Blast Survey/Schedule <br /> 4_Warnings&Records -3) <br /> 5._Control of Adverse Effects <br /> 25.Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br /> a Date of last a.Total <br /> State Complete <br /> Inspection / / 0.5 a.Permit Review 333.0 bonded <br /> Frequency for previous 4 Calendar Qtrs. b.Phase I 11386.0 permitted <br /> a <br /> b.Number of Number of 0.0 0.0 released <br /> b.Inspection Time <br /> required complete 333.0 b.Disturbed <br /> pomplete a inspections 0 c.Phase H (Estimated) <br /> inspections conducted <br /> c.Number of Number of 0'0 c.Travel Time 0.0 released <br /> partiaired l ] i�pections a 0.5 0.0 d ' III <br /> Page 1 of, <br /> inspections conducted d.ReportWriting released R-Wd11y1.1M <br />
The URL can be used to link to this page
Your browser does not support the video tag.