My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-02-07_ENFORCEMENT - C1981017 (4)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981017
>
1994-02-07_ENFORCEMENT - C1981017 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2021 10:47:15 AM
Creation date
10/17/2012 10:56:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Enforcement
Doc Date
2/7/1994
Doc Name
Bid Documents (IMP) CV-93-093
Violation No.
C-93-093
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z <br /> t -s <br /> MID-CONTINENT RESOURCES <br /> P.O.Box 1298 <br /> Glenwood Springs, CO 81602 <br /> August 13, 1993 <br /> Anthony J. Waldron <br /> Reclamation Specialist <br /> Division of Minerals & Geology <br /> 1313 Sherman St. <br /> Room 215 <br /> Denver, CO 80203 <br /> RE: Request for extension of abatement periods. NoVs C-93-093, C-93-096, <br /> C-93-098, C-93-108. <br /> Dear Mr. Waldron: <br /> Although we've had a number of previous discussions and correspondence, it occurs to <br /> me that it might be helpful to consolidate our requests for extension of certain <br /> abatement deadlines of late July/early August. <br /> We've requested extensions of NoVs C-93-093, C-93-094, C-93-096 and C-93-108. <br /> None of these requests would extend the abatement period beyond 90 days from the <br /> time the violation was written. <br /> C-93-093 <br /> The abatement requires placement of topsoil on the terraces of the Sutey pile. As we <br /> are going to be placing topsoil on the pile as a whole within the next several weeks, it <br /> allows greater efficiency to place the topsoil on the terraces at the same time we are <br /> transporting topsoil to the remaining sections of the pile. <br /> C-93-096 <br /> Concerning submittal of as-built certifications on the ditch above the area adjacent the <br /> old refuse pile. The ditch has been constructed; however, the requirement for as-built <br /> certifications had not been included on the original NoV, and so had not been included <br /> in our lists of necessary abatement steps. We will submit the certification if required by <br /> the Division, but do require more time to prepare it. <br /> C-93-098 <br /> We would like further clarification from the Division as to steps to be taken to <br /> appropriately comply with the abatement requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.