Laserfiche WebLink
3.0 Upon approval of the U.S. Bankruptcy Court for authorization to expend <br /> funds and the availability of such funds, whether via asset sales or advances <br /> from creditors, Mid-Continent, via its designated mine operator, A.M. King <br /> Industries, Inc. or via other qualified contractors, will proceed with sealing the <br /> portals of the mines.... <br /> 4.0 The sealing of mine portals will continue on a normal weekly schedule ... <br /> weather and seasonal conditions permitting ...Due to safety concerns on steep, <br /> rocky slopes, narrow roads, and winter avalanche dangers, work will be <br /> suspended during inclement weather and winter months when the portals <br /> become inaccessible due to snow cover. <br /> 7.0 The sequential order of sealing the mines... provides for sealing the last <br /> upper and lower portals of each mine simultaneously in order to provide a natural <br /> ventilation circuit until the last seal is in place. Seals 6 and 7, 13 and 14, and 40 <br /> and 41 frock tunnel portals]will be built simultaneously. <br /> Portal Sealing <br />