My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-09-20_REVISION - C1981017
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981017
>
1989-09-20_REVISION - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2021 1:28:47 PM
Creation date
10/17/2012 10:08:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Revision
Doc Date
9/20/1989
Doc Name
Bid Documents (IMP) Adequacy Review TR-12
Type & Sequence
TR12
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-:tra I t, r1 L I 11 Tatra I L; I II-r. V �1 ,�I_I L : _ :t-ri , HUH]. _v rr1I rNELti L_HtILS L_ : 44 <br />Noe eeuuw Tn oounoco, <br />625 PLAIN811.8 118A15 - SUITE 220 <br />wuLOw9R00K, ILLINOIS 80521 <br />August 31, IrJR9 <br />Dear Mr. Crick, <br />Sincerely, <br />Scott Jonoa <br />Project Engineer <br />MID- CONTINENT RESOURCES, INC. <br />PRODUCERS OF 1 FAMOUS COAL BASIN COKING COAL <br />BOX 158 <br />CARBONDALE COLORADO 81823 <br />William A. Crick <br />Reclamation Specialist <br />Mined Land Reclamation Division <br />215 Centennial Bldg. <br />1310 Sherman Street <br />Denver, CO 80203 -2273 <br />RE: Minor Revision No. 24, installation of Pipeline and Building <br />fnr Mini Writrr DrninnVo Treatment vr�tAli} <br />After our conversation today, Mid- Continent Resources would like <br />to submit some more information Concerning the above mentioned <br />minor revision. <br />Mid-Continent would agree to rair;e the box1d amount for the <br />removal of the new water treatment plant to $,14 per cubic foot. <br />As we discussed, the footers and floor will not be removed at the <br />end of mining operations. The entire Preparation Plant area is to <br />L. r .. L. L,. 1. Tk, ni11 <br />be removed and backfill will be brought in to bring this urea <br />back to AOC. in the process, all of the concrete will be buried <br />under many feet of fill. <br />The new bond r1:1Icul.vl.lutl.: v47L LLtw wr wk li rcltnr! -VIT mrr l <br />36' wide X 16' long X 25' high X ;$. 1'lfcu. ft, = $2260 <br />Corltiiigeiiuy Cull P 25% $ 567 <br />Total Bond Rerjuirpment = $2825 <br />TFI FP f\IF <br />Mel 963,258' <br />+wx <br />910 929 5694 <br />TLX <br />45.0724 <br />I1 you have any questions or r'eLiuir'e molt- ie,'ft:ccmat tan please call <br />me here at the mine, 563 -0555. <br />
The URL can be used to link to this page
Your browser does not support the video tag.