Laserfiche WebLink
1876 <br />DEPARTMENT OF NATURAL RESOURCES <br />MINED LAND RECLAMATION DIVISION <br />FRED R. BANTA, Director <br />Removal of 6,500 feet of culvert <br />Backhoe w/24" bucket - 200 ft /hr @ $60 hr. <br />Disposal of culvert @ $4.32/cy <br />Fill trench w /D8 catepillar @ $115. hr <br />Profit, overhead, and engineering costs, approx 25% <br />Subtotal <br />Removal of facility <br />Demolish and remove 36' X 18' X 25' bldg @ $.14 /cf <br />Remove 1' X 2' footer 2 /rebar 108' @ $6.95/lf <br />Remove 6" wire mesh concrete floor @ $2.31 /sf <br />Disposal of concrete rubble 20 cy @ $4.32/cy <br />Profit, overhead, and engineering costs, approx 25% <br />Subtotal <br />Bond increase rounded to $10,000 <br />HR /eke <br />9362F <br />STATE OF COLORADO <br />TOTAL <br />Roy Romer, Governor <br />DATE: August 30, 1989 <br />TO: Bill Crick <br />FROM: Harry Ranney <br />RE: Bond Estimate for MR -24, Mid Continent Resources <br />The following are my calculations for the increase in reclamation costs to <br />remove the 6500 feet of culvert and the new facility building. <br />$ 1 ,950 <br />1 ,000 <br />460 <br />$ 3,410 <br />853 <br />$ 4,263 <br />$ 2,268 <br />750 <br />1 ,495 <br />90 <br />$ 4,603 <br />$ 1 ,150 <br />$ 5,753 <br />215 Centennial Building, 1313 Sherman Street Denver, Colorado 80203-2273 Tel. (303) 866 -3567 <br />