Laserfiche WebLink
conveyors, bins, track, etc. ) . The concrete <br /> buildings and foundations will then be broken <br /> up and pushed against the mine entry face-up. " <br /> The footers beneath the foundations will remain in the ground, and <br /> will be buried. <br /> Reclamation costs for the No. 1 Portal Area are provided in Vol. <br /> 8, Chapter V, Appendix V-D-1. The unit cost for cement/cinder <br /> block structures is .17 per cu. ft. ; for metal .13 per cu. ft. <br /> Included in the reclamation cost estimate is 25% for administrative <br /> costs to the MLRD. <br /> Our bond calculation TOTALS $3 , 372.55, estimated as follows: <br /> Concrete Building <br /> 28' x 40.67' x 121= 13 ,665 cu. ft. <br /> x .17 = 2323 .05 <br /> Concrete Pad <br /> 16.67' x 16' x .67' = 178.70 cu. ft. <br /> x .17 = 30. 38 <br /> Metal Silo <br /> 3.14 x 6.52 x 20' = 2655 cu. ft. <br /> x . 13 = 345.15 <br /> TOTAL = 2,698.58 <br /> MLRD Administrative Cost = 25% = 674.65 <br /> TOTAL 3 , 373 .23 <br /> Enclosed is a revised map, II-B-4-b indicating the site and <br /> addition to the brieden plant. <br /> Thank you. <br /> Yours truly, <br /> Diane Delaney <br /> Mid-Continent Resources <br /> 2 <br />