Laserfiche WebLink
h1rIririi = F'eristr_ ne T E L hJn . i4, 5-4'+« OCt. . 7.,0 '=+ 11 : F3 F' . C2 <br /> s <br /> conveyors, bins, track, etc. ) . The concrete <br /> buildings and foundations will then be broken <br /> up and pushed against the mine entry face-up. <br /> The footers beneath the foundations will remain in the ground, and <br /> will be buried. <br /> Reclamation costs for the No. 1 Portal Area are provided in Vol. <br /> s , Chapter V, Appendix V-D-1. The unit cost for cement/cinder <br /> block structures is .17 per cu. ft. ; for metal .13 per cu. ft. <br /> Included in he reclamation cost estimate is 25% for administrative <br /> costs to the MLRD. <br /> Our bond calculation TOTALS $3 ,372.55, estimated as follows: <br /> Concrete Building <br /> 28' x 40.67' x 12'= 13,665 cu. ft. 2323.05 <br /> x . 17 = <br /> co:, ~rete Pad <br /> 16 . 67' x 16' x .67' = 178.70 cu. ft. 30 . 38 <br /> x . 17 = <br /> ,4e+ ai Silo <br /> 3 . 14 x 6.52 x 200 = 2655 cu. ft. 345. 15 <br /> x .13 = <br /> TOTAL = 2,698. 58 <br /> MLRD Administrative Cost = 25% = 674.65 <br /> TOTAL 3 , 373 . 23 <br /> Fn,.:) osed is a revised map, II-B-4-b indicating the site and <br /> addition to the brieden plant. <br /> Thank you. <br /> Yours truly, <br /> Diane Delaney <br /> Mid-Continent Resources <br /> 1 <br /> 2 <br />