Laserfiche WebLink
RUG 09 193 09:17 TO: 303 832 8106 P03 <br /> Vol. 10 Chap. 2S <br /> Appendix C <br /> Topsoil and fill material were removed from a triangular area measuring 85' x 120' x <br /> 1301, situated to the west of an area which had previously been cleared of topsoil in <br /> anticipation of the expansion of the coal refuse disposal area. Such an expansion did <br /> not occur, as a second refuse disposal area was subsequently permitted and <br /> developed. <br /> The topsoil material was spread over the area as a whole. Fill material placed at the <br /> base of the hill was utilized to direct drainage from the hillside itself, and from a series <br /> of seeps, to sediment pond 0098. <br /> A ditch along the lower sector of the hillside was constructed to intercept water from the <br /> seeps. Designs, sizes and certification of the ditch is attached. <br /> A small area at the northwest section of the area drains to the west, rather than back to <br /> Ponnd 0098. A berm and gravel filter fence have been constructed as an alternate <br /> form of sediment control, and SAE demonstration will be made. <br /> MR-39 08/08/93 <br />