Laserfiche WebLink
-3- <br /> 4. Effect on Permit. In addition, if it is determined that a pattern of <br /> violations exists and that the violations were caused by unwarranted failure <br /> to comply, or were willful, your permit may be suspended or revoked. <br /> SCHEDULE TO NOTICE OF VIOLATION <br /> Notice of Violation No. NOV C-84-105 <br /> NATURE OF VIOLATION: <br /> Failure to minimize disturbance to the hydrologic balance. Specifically, <br /> failure to maintain the drainage control system. <br /> ACT, REGULATION, OR PERMIT PROVISIONS) VIOLATED: <br /> ACT SECTIONS) 34-33-121 (2)(i ) <br /> REGULATION SECTIONS) 4.05.3(3) <br /> PERMIT SECTION(S) <br /> PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br /> The rock tunnel site. Specifically, the drop-box conveying drainage to the <br /> temporary sediment pond. <br /> STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION) : <br /> Clean the drop-box structure and ensure that all drainage from the rock tunnel <br /> facilities area enters the sediment pond in such a way that short circuiting <br /> is prevented. <br /> TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS) : <br /> ON OR BEFORE <br /> By June 18, 1984 <br /> /ep <br /> Doc. No. 1881 <br />