Laserfiche WebLink
-3- <br /> 4. Effect on Permit. In addition, if it is determined that a pattern of <br /> violations exists and that the violations were caused by unwarranted failure <br /> to comply, or were willful , your permit may be suspended or revoked. <br /> SCHEDULE TO NOTICE OF VIOLATION <br /> Notice of Violation No. NOV C-84-104 <br /> NATURE OF VIOLATION: <br /> Failure to properly monitor surface and ground water. Specifically, failure <br /> to monitor ground water at the rock tunnel waste disposal site between <br /> November, 1983 and May, 1984 and failure to monitor discharge points for oil <br /> and grease according to the NPDES permit. <br /> ACT, REGULATION, OR PERMIT PROVISIONS) VIOLATED: <br /> ACT SECTIONS) 34-33-122(2) and (3) <br /> REGULATION SECTIONS) 4.05. 13(1) and (2) <br /> PERMIT SECTIONS) <br /> PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br /> The rock tunnel waste disposal site ground water monitoring station and all <br /> NPDES discharge points at the mining operation. <br /> STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION) : <br /> 1 . Initiate monitoring of the repaired ground water monitoring station at <br /> the rock tunnel waste disposal site. <br /> 2. Initiate monitoring of oil and grease at all mine discharge points. <br /> TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS) : <br /> ON OR BEFORE <br /> Immediately <br /> /ep <br /> Doc. No. 1880 <br />