My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (147)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (147)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 7:43:45 AM
Creation date
10/17/2012 8:49:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br /> 4. Effect on Permit. In addition, if it is determined that a pattern of <br /> violations exists and that the violations were caused by unwarranted failure <br /> to comply, or were willful , your permit may be suspended or revoked. <br /> SCHEDULE TO NOTICE OF VIOLATION <br /> Notice of Violation No. NOV C-84-102 <br /> NATURE OF VIOLATION: <br /> Failure to properly maintain the haul road drainage system. <br /> ACT, REGULATION, OR PERMIT PROVISIONS) VIOLATED: <br /> ACT SECTION(S) 34-33-121 (2)(j) , 34-33-120(2)(q) <br /> REGULATION SECTIONS) 4.03.1 (6) <br /> PERMIT SECTIONS) <br /> PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br /> The Mine No. 5 haul road. <br /> STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION) : <br /> 1. Replace the downpipe on the first culvert past the junction of the <br /> Mine No. 3 and Mine No. 5 haul roads, and repair the embankment erosion. <br /> 2. Replace the end section of the Oil Well Creek Culvert and repair the <br /> embankment erosion. <br /> 3. Clean the Coal Creek Culvert near the old town of Coal Basin and repair <br /> the road erosion. <br /> 4. Reconstruct the berm along the edge of the Mine No. 5 road to prevent <br /> erosion of the outslope. <br /> 5. Reconstruct the drainage ditch leading to Culvert No. G19 near the <br /> 180 degree switchback of the Mine No. 5 haul road and repair any <br /> embankment erosion where drainage flowed over the road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.