Laserfiche WebLink
-3- <br /> 4. Effect on Permit. In addition, if it is determined that a pattern of <br /> violations exists and that the violations were caused by unwarranted failure <br /> to comply, or were willful , your permit may be suspended or revoked. <br /> SCHEDULE TO NOTICE OF VIOLATION <br /> Notice of Violation No. NOV C-84-095 <br /> NATURE OF VIOLATION: <br /> Failure to follow the approved mine plan. Specifically, stockpiling coal at <br /> the Mine No. 2 bin pad which resulted in damage to off-site areas when coal <br /> was dumped or pushed over the edge of the mine bench. <br /> ACT, REGULATION, OR PERMIT PROVISIONS) VIOLATED: <br /> ACT SECTIONS) 34-33-123(2), 34-33-121 (2)(g) <br /> REGULATION SECTIONS) 5.03.2(2) (a) <br /> PERMIT SECTIONS) Volume 1, Section II-b, Map II-B-2-a <br /> PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br /> The Mine No. 2 bin pad. <br /> STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION) : <br /> Remove all coal from the Mine No. 2 bin pad and remove all coal practicable <br /> from the outslope of the Mine No. 2 bin pad and undisturbed area below. <br /> TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS) : <br /> ON OR BEFORE <br /> By July 2, 1984 <br /> /e p <br /> Doc. No. 1866 <br />