Laserfiche WebLink
4. Effect on Permit. In addition, if it is determined that a pattern of <br /> violations exists and that the violations were caused by unwarranted failure <br /> to comply, or were willful , your permit may be suspended or revoked. <br /> SCHEDULE TO NOTICE OF VIOLATION <br /> Notice of Violation No. NOV C-84-092 <br /> NATURE OF VIOLATION: <br /> Failure to maintain and construct haul roads with proper materials. <br /> Specifically, utilizing material containing coal for road base. <br /> ACT, REGULATION, OR PERMIT PROVISIONS) VIOLATED: <br /> ACT SECTIONS) 34-33-121 (2)(j), 34-33-120(2)(g) <br /> REGULATION SECTION(S) 4.03. 1(1) (a) and (b) <br /> PERMIT SECTIONS) <br /> PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br /> The Mines 1 and 2 haul road system. Specifically, that portion of the haul <br /> road between the Mine No. 2 bin pad an the Mine No. 1 bin. <br /> STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION) : <br /> Remove all the material containing coal that was dumped on the road and <br /> dispose of this material in either the coal processing waste pile or the rock <br /> tunnel waste pile. <br /> TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br /> ON OR BEFORE <br /> By June 4, 1984 <br /> /ep <br /> Doc. No. 1858 <br />