Laserfiche WebLink
-3- <br /> 4. Effect on Permit. In addition, if it is determined that a pattern of <br /> violations exists and that the violations were caused by unwarranted failure <br /> to comply, or were willful, your permit may be suspended or revoked. <br /> SCHEDULE TO NOTICE OF VIOLATION <br /> Notice of Violation No. NOV C-84-090 <br /> NATURE OF VIOLATION: <br /> Failure to minimize disturbance to the prevailing hydrologic balance. <br /> Specifically, failure to maintain the sediment and drainage control system. <br /> ACT, REGULATION, OR PERMIT PROVISIONS) VIOLATED: <br /> ACT SECTIONS) 34-33-121 (2) (i) <br /> REGULATION SECTIONS) 4.05.6(3), 4.05.3(3) <br /> PERMIT SECTIONS) <br /> PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br /> The Mines 1 and 2 sediment and drainage control system. <br /> STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION) : <br /> 1. Redefine the east drainage ditch into the upper sediment pond to assure <br /> that disturbed drainage does not short circuit the sediment control <br /> system. <br /> 2. Clean sediment from both the upper and lower sediment ponds. <br /> 3. Repair the gullying in the embankment of the west drainage ditch. <br /> 4. Revise the permit application to include a contingency plan for treating <br /> runoff to remove suspended solids. This plan must include a metering <br /> system for the addition of any chemical additives <br /> TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS) : <br /> ON OR BEFORE <br /> Item 1 - By June 04, 1984 <br /> Item 2 - By June 18, 1984 <br /> Item 3 - By June 25, 1984 <br /> Item 4 - By August 27, 1984 <br /> /ep <br /> Doc. No. 1854 <br />