Laserfiche WebLink
I <br /> -3- <br /> 4. Effect on Permit. In addition, if it is determined that a pattern of <br /> violations exists an that the violations were caused by unwarranted failure <br /> to comply, or were willful, your permit may be suspended or revoked. <br /> SCHEDULE TO NOTICE OF VIOLATION <br /> Notice of Violation No. NOV C-84-087 <br /> NATURE OF VIOLATION: <br /> Failure to properly salvage topsoil . <br /> ACT, REGULATION, OR PERMIT PROVISIONS) VIOLATED: <br /> ACT SECTION(S) 34-33-121 (2) (j), 34-33-120(2) (e) <br /> REGULATION SECTIONS) 4.06.2(1)&(2) <br /> PERMIT SECTIONS) <br /> PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br /> The preparations plan area. Specifically, the exploration drill site near the <br /> slurry pond and the ditch excavated south of the warehouse. <br /> STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION) : <br /> Remove the topsoil from the drill pad near the slurry pond and pick-up the <br /> topsoil from the ditch excavation. Place the topsoil from both sites in an <br /> approved topsoil stockpile. <br /> TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS) : <br /> ON OR BEFORE June 15, 1984. <br /> /ep <br /> Doc. No. 1844 <br />