My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (147)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (147)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 7:43:45 AM
Creation date
10/17/2012 8:49:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br /> 4. Effect on Permit. In addition, if it is determined that a pattern of <br /> violations exists and that the violations were caused by unwarranted failure to <br /> comply, or were willful, your permit may be suspended or revoked. <br /> SCHEDULE TO NOTICE OF VIOLATION <br /> Notice of Violation No. NOV C-84-060 <br /> NATURE OF VIOLATION: <br /> Failure to maintain sediment control measures so as to prevent disturbance <br /> to unaffected areas and failure to minimize to the extent oossib1p <br /> adverse impacts on fish, wildlife and other related environmental values. <br /> ACT, REGULATION, OR PERMIT PROVISIUN(S) VIOLATED: <br /> ACT SECTION(S) 34-33-121(K) <br /> REGULATION SECTIONS) Rule 4.05. 5(l) , Rule 4.01.1(5) <br /> PERMIT SECTIONS) <br /> PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br /> Rock tunnel waste disposal area, where saturated waste material had flowed <br /> from the eastern end of the pile and passed through an undisturbed aspen <br /> grove for approximately 150 feet <br /> STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION) : <br /> Pull saturated debris away from the eastern refuse area border and construct <br /> a berm from dry rock tunnel waste so as to insure that drainage and slide <br /> debris is contained within the disturbed area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.