Laserfiche WebLink
-3- <br /> 4. Effect on Permit. In addition, if it is determined that a pattern of <br /> violations exists and that the violations were caused by unwarranted failure to <br /> comply, or were willful , your permit may be suspended or revoked. <br /> SCHEDULE TO NOTICE OF VIOLATION <br /> Notice of Violation No. NOV C-84-052 <br /> NATURE OF VIOLATION: <br /> Failure to follow the approved mine plan. Specifically, failure to spread and <br /> compact underground developement waste in two foot lifts during construction of <br /> the waste embankment. <br /> ACT, RaGULATION, OR PERMIT PROVISIUN(S) VIOLATEU: <br /> ACT SECTION(S) 34 33-123(2) 34-33-121(2) (d) <br /> REGULATION SECTIONIS) 5 03 2(2) (a) 4 09 1(7) <br /> PERMIT SECTIONS) Volume 2 Appendix II - B-5 Page 38 <br /> PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br /> The Rock Tunnel underground development waste disposal embankment <br /> STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION) : <br /> Mid Continent Resources , Inc must submit material strength analyses of the <br /> in place underground development waste collected at the leading edge (east end) <br /> of the waste disposal pile by May 7 1984 If the material densities are found <br /> to be lower than those assumed in designing the waste embankment, then Mid-Continent <br /> must submit a plan and schedule, by June 4, 1984, for bringing the waste pile into <br /> compliance. <br />