My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (147)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (147)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 7:43:45 AM
Creation date
10/17/2012 8:49:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br /> 4. Effect on Permit. In addition, if it is determined that a pattern of <br /> violations exists and that the violations were caused by unwarranted failure <br /> to comply, or were willful , your permit may be suspended or revoked. <br /> SCHEDULE TO NOTICE OF VIOLATION <br /> Notice of Violation No. NOV C-84-106 <br /> NATURE OF VIOLATION: <br /> Failure to permit temporary impoundments. Failure to permit a drainage <br /> ditch. Specifically, failure to submit designs in conformance with <br /> Rule 4.05.9(2) for the preparations plant slurry ponds and preparations plant <br /> fresh water pond, and the Arctic Circle fresh water pond, and failure to <br /> submit designs for the drainage ditch from the preparation plant to discharge <br /> point 001 . <br /> ACT, REGULATION, OR PERMIT PROVISIONS) VIOLATED: <br /> ACT SECTIONS) <br /> REGULATION SECTIONS) 4.05.9(2), 4.05.3 <br /> PERMIT SECTIONS) Chapter II, Volume 1 , 2, and 3 <br /> PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br /> The preparation plant slurry pond and fresh water pond and the Arctic Circle <br /> fresh water pond. The drainage ditch conveying runoff from the preparation <br /> plant to the four ponds in series at discharge point 001 . <br /> STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION) : <br /> 1 . Submit designs in accordance with Rule 4.05.9(2) for the preparation <br /> plant slurry pond and fresh water pond and the Arctic Circle fresh water <br /> pond. <br /> 2. Submit designs for the preparations plant drainage ditch in accordance <br /> with Rule 4.05.3 <br /> TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS) : <br /> ON OR BEFORE <br /> By July 30, 1984 <br /> /ep <br /> Doc. No. 1883 <br />
The URL can be used to link to this page
Your browser does not support the video tag.