My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (143)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (143)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 7:37:51 AM
Creation date
10/17/2012 8:05:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOV C-84-082 <br /> B. Seriousness: <br /> No actual damage occurred to natural resources as a result of this <br /> violation. If damage had occurred, it would have been of short <br /> duration and small extent. However, it is likely that untreated <br /> sediment would have entered Coal Creek from this area if <br /> precipitation occurred before the sediment control system was <br /> installed. It is for this reason that $325.00 is assessed for the <br /> potential seriousness of the violation. <br /> C. Fault: <br /> This violation was avoidable with careful anticipation by the <br /> operator, at the point during the construction of the blending <br /> facilities, that it would have been possible to connect the <br /> conveyance structures to the sediment control system. Given that <br /> the operator did not exercise such careful anticipation and <br /> planning, $250.00 is assessed for minor negligence. <br /> D. Good Faith: <br /> After the operator was issued a violation for failure to provide <br /> sediment control at the blending facilities, a considerable effort <br /> was made to comply with the abatement order and schedule. This <br /> abatement required aggressive response from the operator. In spite <br /> of contracting difficulties, the operator abated the violation <br /> ahead of schedule. Based upon this favorable response, $50.00 for <br /> good faith is awarded. <br /> E. Total Assessment: <br /> The total civil penalty assessment for CO C-84-082 is $575.00. <br /> R <br />
The URL can be used to link to this page
Your browser does not support the video tag.