Laserfiche WebLink
-4- <br />12. Primary future (Post - mining) land use (check one <br />Cropland(CR) 1 Pastureland(PL) <br />JJ Rangeland(RL) --L] Forestry(FR) <br />Residential(RS) -t___I Recreation(RC) <br />Developed WaterResources(WR) <br />13. Primary present land use check one : <br />c t- Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources( WR) <br />General Agriculture(GA) <br />e Habitat(WL) <br />Industrial/ /Commercial(IC , <br />01 aste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial /Connmercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Dry mining with trackhoe and direct processing or hauling to stockpiles. <br />15. On Site Processing: t • i Crushing /Screening <br />13.1 Briefly explain mining method (e.g. truck /shovel): <br />Portable /mobile in -pit crushing, screening and sorting. <br />List any designated chemicals or acid- producing materials to be used or stored within permit area: <br />N/A <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Continuation of previous amendment and Technical Revisions for mining with no expansion of _ <br />permit area but also to incorporate excess reservoir construction by- product (shale) into <br />from permit area and /or surety reduction. <br />