Laserfiche WebLink
Mr. Jim Dupler <br />Division of Reclamation, Mining, and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Dear Mr. Dupler: <br />Thank you, <br />Joe Lamanna <br />Quarry Manager <br />Holcim (US) Portland Plant <br />NQIcim <br />Holcim (US) Inc <br />3500 State Hwy 120 <br />Florence, Co 81226 <br />October 8, 2012 RECF" ' <br />Division o . <br />Mining & Sa.l..y <br />Phone 719 - 784 -6325 <br />Fax. 719 -784 -3470 <br />www.holcim.com /us <br />OCT 1 0201 <br />Subject: Holcim (US) Inc., Portland Limestone Quarry (Permit # M- 1977 -344) 2011 <br />Annual Report <br />Attached please find the 2012 annual report and map for the Portland Plant Limestone <br />Quarry and Operation. Enclosed with the report is a check for $791.00, to cover the <br />annual fees from October 10, 2011 through October 10, 2012. <br />After reviewing the requirements outlined in question 2, rule 3.1.12(2) it was determined <br />that some additional work is required to fully define the boundary requirements as <br />outlined in that rule. Therefore, in the coming weeks Portland survey personnel will <br />address this requirement to ensure compliance with the division standards. <br />Should you have any questions or need any additional information please feel free to <br />contact me at (719) 784 -1209. <br />