Laserfiche WebLink
___ <br />�gVP <br />s M �yF;ya 1,��1'L U.S. DEPT. OF THE INTERIOR �1`� <br />i° z "0 op OFFICE OF SURFACE MINING ell <br />j , <br />'' Mine Site Evaluation °,' <br />` �4RCH 3 10%9 .(sd \ ®� State Program F°Fc� <br />it gq <br />1. Permittee/Person <br />18. CCID # <br />9. Permit Number <br />140 <br />10. Permit Type <br />TERROR CREEK CO. <br />20. M.S.H.A. ID # <br />C- 059 -83 <br />22. Coun Burrough <br />PP <br />2. Address <br />DELTA <br />11. Field Visit Date <br />12. Purpose <br />13. SRA Present <br />P.O. BOX 535 <br />9/12/2012 <br />F0_ C <br />3737 HIGHWAY 133 <br />dd -ryy <br />3. City <br />4. State <br />14. Permit Status <br />15. Site Status <br />16. Facility Type <br />SOMERSET <br />F CO <br />0 <br />FN_M_� <br />ADFG <br />5. Zip Code 6. Phone Number <br />81434 (970) 929 -5855 <br />7. Operator Name, if Different than Permittee <br />8. Mine Name <br />TERROR CREEK LOADOUT <br />25. Hours <br />1.0 a. Permit Review <br />2.0 b. Site Visit Time <br />6.0 c. Travel Time <br />3.0 d. Report Writing <br />26. Signature Block <br />17. OSM Office # <br />18. CCID # <br />19. Land Code <br />140 <br />20. M.S.H.A. ID # <br />21. State Abbrev. <br />22. Coun Burrough <br />05 -03818 <br />F CO <br />DELTA <br />23. AVS Permittee <br />Entity ID Number <br />24. State Office <br />097719 i <br />27. <br />Signature Signature- <br />Christine Belka, ID #182 I Review Date: / •/ - / <br />Name- Pnnted Nam i= - dd - yyyy <br />Date: 9/27/2012 I Is Supplemental MSE Page Used Y/N El <br />Permit Type - Item 10 IP = Intenm Program PP = Permanent Program NP = No Permit <br />Purpose Type Codes - Item 12 CCR..Citizen Complaint Referral (non -site visit <br />Oxx ... Oversight RFx..Redamation Fees CC ..... Cibzen Complaint (initial site visit) <br />Axx...Assistance Fxx ... Federal Actions CCF ... Assistance <br />Joint Inspection - Item 13 A joint inspection is when a state inspector accompanies an Z5SM inspector at any time during the review of the mine site <br />Permit Status - Item 14 AB Abandoned: All surface and underground coal mining activities have ceased and operator <br />A Active: Coal mining activities occurring or permitted but not yet has left the site without completing reclamation as defined in 30 CFR 840:11(g) <br />disturbed. AB7 Bond Forfeiture- Bond forfeiture officially in process or completed and reclamation in <br />IN Inactive (Permanent Program Permit). Phase II completed or progress or not yet commenced <br />Temporary Cessation of Operations. (interim Program Permit): AB2 Partially Reclaimed Forfeiture- Forfeited site where all bonds have been used to reclaim site, <br />Coal mining completed and reclamation activities initiated. but site not reclaimed to Program standards <br />BR Bond Release: Reclamation completed and State Regulatory AS3 Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority(RA) has released all of the bond (Phase III Release). NA Not Applicable: When site is unpermitted. <br />Site Status - Item 16 MC Mining Complete: No mining activity on site, site NS Non -Site Visit Status of site not determined. <br />ND No Disturbance- No coal mining and redamation regraded and awaiting bond release Forfeiture Pending: The RA is pursuing actions to <br />operations have been started. TC Temporary Cessation: The RA has granted FP revoke the permit, collect the performance bond(s), <br />EX Coal Exploration: Coal exploration operations have cessation of mining pursuant to 30 CFR and /or reclamation of forfeited site is in progress. <br />started and where coal mining operations have not 816/817:13(b). FR Forfeited and Reclaimed: Forfeiture reclamation <br />begun. Pi Phase I Release. At least Phase I bond release completed <br />AP Active Coal Producing: Coal surface mining granted for entire permitted area. For interim FO Abandoned Site: Abandoned site that is permitted but <br />activities are occurring. permits, partial bond release. there is no bond. <br />AN Active Non - Producing: Active non - producing facility P2 Phase 11 Release: At least Phase 11 bond release WC Wildcat Coal mining and reclamation operations have <br />such as tipple or preparation plant for the entire permitted area or are taking place and the activity is not covered by <br />NM No Mining: The Permit Status is active, site is not in P3 Phase III Release. Reclamation completed and the required permits from the RA <br />Temporary Cessation, no surface coal mining the RA has released all bond. <br />activity, and site not regraded. <br />Facility Type Codes - Item 16 D .... Ancillary (Haulroad, Conveyor, and /or Rails H ... Exploration Permits K. ..Government Financed Construction Exemption <br />A. ..Surface E .... Refuse and /or Impoundment I .... Notice of Intent to Explore L .... Remining site permitted under 30 CFR 785.25 <br />B....underground F....Loading Facility and /or Tipple J...,Exempt 16 and 2/3 <br />C ...Preparation Plant G... Stockpiles <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from small businesses about Federal agency <br />enforcement actions. The Ombudsman will annually evaluate the enforcement acbvites and rate each agency's responsiveness to small business If you are a small business (a business with 500 or <br />fewer employees including those of affiliates) and wish to comment on the enforcement or compliance activities of OSM, rail 1- 888 -REG -FAIR (1 -888- 7343247). <br />Page 1 <br />