Laserfiche WebLink
TABLE OF CONTENTS (Continued) <br />2.1 MAPS AND PLANS <br />2.10.1 GENERAL REQUIREMENTS .................. ............................... 2.10 -1 <br />2.10.2 PERMIT AND ADJACENT AREAS ........... ............................... 2.10 -1 <br />2.10.3 SPECIFIC INFORMATION REQUIREMENTS ............................ 2.10 -1 <br />RULE 3: PERFORMANCE BOND REQUIREMENTS <br />3.01 INTRODUCTION 3 -1 <br />3.02 PERFORMANCE BOND REQUIREMENTS FOR SURFACE <br />COAL MINING OPERATIONS <br />3.02.1 General Requirements 3 -1 <br />3.02.2 Determination of Bond Amount 3 -1 <br />3.02.3 Period of Liability for Performance Boned 3 -2 <br />3.02.4 Form, Conditions, and Terms of Performance Bonds 3 -2 <br />REFERENCES................................................................. ............................... R -1 <br />Exhibits <br />Exhibit <br />1 <br />Withdrawn by MR -13 <br />Exhibit <br />2 <br />Right to Enter /Legal Description <br />Exhibit <br />3 <br />Insurance Certificate <br />Exhibit <br />4 <br />Proposed Newspaper Notification <br />Exhibit <br />5 <br />Cultural Resources Report <br />Exhibit <br />6 <br />Geology Technical Report <br />Exhibit <br />7 <br />Groundwater Technical Report <br />Exhibit <br />8 <br />Surface Water Technical Report <br />Exhibit <br />9 <br />Soils Technical Report <br />Exhibit <br />10 <br />Vegetation Technical Report <br />Exhibit <br />11 <br />Wildlife Technical Report <br />Exhibit <br />12 <br />Aquatic Technical Report <br />Exhibit <br />13 <br />Geotechnical Design of Fill Areas <br />Exhibit <br />14 <br />Road Drainage Design <br />Exhibit <br />15 <br />Pond Drainage Design <br />Exhibit <br />16 <br />Overburden Calculations <br />Exhibit <br />17 <br />Post Mining Land Use Approval <br />Exhibit <br />18 <br />AVF Technical Report <br />Exhibit <br />19 <br />Channel Design - Reconstruction of Ephemeral Streams <br />Exhibit <br />20 <br />Air Emissions Permit . <br />Exhibit <br />21 <br />NPDES Permit, SPCC and Stormwater Plans <br />Exhibit <br />22 <br />Soil Analysis Reports <br />Exhibit <br />23 <br />Bond Calculations <br />MR -13 vii (Revised 2/26/10) <br />