My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-01_REVISION - M1977284 (9)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977284
>
2012-10-01_REVISION - M1977284 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:25:47 PM
Creation date
10/12/2012 3:02:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977284
IBM Index Class Name
REVISION
Doc Date
10/1/2012
Doc Name
AM-01 APPLICATION
From
COTTER
To
DRMS
Type & Sequence
AM1
Email Name
DMC
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mineral Joe Mine Environmental Protection Plan <br />Notes: <br />Item <br />Site Diversion Drainage Route all non - contact stormwater around Complete <br />site <br />Stormwater BMPs Regular maintenance of existing BMPs Ongoing <br />Sealing of mine portal <br />Sealing of egress portal <br />Decommissioning of fuel <br />storage area <br />Final reclamation <br />BMP = Best Management Practice. <br />TBD = dates to be determined <br />Table 22. Construction Schedule <br />Description <br />Permanently seal mine portal to prevent <br />human or animal intrusion <br />Permanently seal egress portal to prevent <br />human or animal intrusion <br />Regrade, revegetate and implement post - <br />mining stormwater BMPs (surface <br />drainage) <br />Status / Date <br />Pending (post mining) <br />Pending (post mining) <br />Remove fuels, oils, and lubricants. <br />Decommission liner and remove berm in Pending (post mining) <br />preparation for site regrading and reseeding. <br />Pending (post mining) <br />42 <br />12. QUALITY ASSURANCE / QUALITY CONTROL <br />Rule 6.4.21(16) asks for a description of the Quality Assurance and Quality Control program and measures <br />to be employed during construction of the Environmental Protection Facilities discussed in Rule 6.4.21(15). <br />The quality control for construction of stormwater BMPs will include the submission of as -built <br />engineering drawings ( "As- Builts "). The As- Builts will be provided within 90 days after the stormwater <br />facilities are constructed and will be certified (signed and stamped). <br />Geochemical sampling will be conducted on ore and waste rock (run -of -mine) during active mining. From <br />the underground mine, at least one sample of waste rock and one sample of ore will be analyzed for <br />geochemical characterization (whole rock, ABA, and SPLP) for every 50,000 tons of waste rock produced, <br />or yearly, whichever occurs more frequently, during active mining operations. <br />The analytical suite is shown in Table 23 and includes whole rock, ABA, and SPLP of both waste and ore. <br />The SPLP analyte list includes all constituents listed in Tables 1 and 2 of the Colorado Water Quality <br />Control Commission Regulation No. 41 (Basic Standards for Ground Water) excluding biological <br />parameters, asbestos, cyanide, nitrate ( speciated), nitrite (speciated), chlorophenol, color, corrosivity, <br />foaming agents, odor, and phenol. The SPLP list contains the following constituents in addition to the <br />Colorado Basic Standards for Groundwater: vanadium, phosphorus, hardness, pH and electrical <br />conductivity. <br />The results of geochemical testing shall be submitted annually to DRMS. <br />4148B.120927 Whetstone Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.