Laserfiche WebLink
Mineral Joe Mine Environmental Protection Plan <br />TABLE OF CONTENTS <br />1. INTRODUCTION 1 <br />1.1 Environmental Protection Plan Requirements and Organization 1 <br />1.2 Site Location and Ownership 1 <br />1.3 Site History 3 <br />1.4 Current and Future Activities 3 <br />2. MAPS 3 <br />3. OTHER PERMITS AND LICENSES, INCLUDING ENVIRONMENTAL PROTECTION AND <br />MONITORING REQUIREMENTS 4 <br />4. FACILITIES EVALUATION 4 <br />5. DESIGNATED CHEMICALS EVALUATION 5 <br />5.1 Rationale 5 <br />5.2 Types, Quantities, and Concentrations of Designated Chemicals 5 <br />5.3 Potentially Toxic - Forming Materials 5 <br />5.3.1 Ore 6 <br />5.3.1.1 Source 6 <br />5.3.1.2 Quantity 6 <br />5.3.2 Waste Rock 6 <br />5.3.2.1 Source 6 <br />5.3.2.2 Quantity 6 <br />5.3.3 Geochemical Characterization of Waste Rock and Ore 6 <br />5.3.3.1 Sample Collection and Handling 7 <br />5.3.3.2 Acid Base Accounting Results 8 <br />5.3.3.3 Whole Rock Elemental Analysis and SPLP Testing Results 9 <br />5.4 Environmental Protection Evaluation 13 <br />5.4.1 COPC Chemistry and Occurrence in the Environment 13 <br />5.4.1.1 Arsenic 13 <br />5.4.1.2 Selenium 14 <br />5.4.1.3 Fluoride 14 <br />5.4.1.4 Molybdenum 14 <br />5.4.1.5 Sulfate 14 <br />5.4.1.6 Total Dissolved Solids 14 <br />5.4.1.7 Vanadium 15 <br />5.4.1.8 Uranium 15 <br />5.4.2 Fate and Transport 17 <br />5.4.2.1 Release 17 <br />5.4.2.2 Transport 18 <br />5.4.2.3 Uptake 19 <br />6. MATERIALS HANDLING 20 <br />6.1 Materials Handling for Designated Chemicals 20 <br />4148B.120927 Whetstone Associates • <br />