My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-12_REVISION - C2009087
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2012-10-12_REVISION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:24 PM
Creation date
10/12/2012 2:11:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
REVISION
Doc Date
10/12/2012
Doc Name
Letter & Application
From
Peabody Sage Creek Mining, LLC
To
DRMS
Type & Sequence
MR13
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�F SOD <br />° COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), technical <br />revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions are to address the <br />requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be submitted in order for it to be <br />complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, tables and/or - <br />figures, with a revised table of contents, if necessary. The revision submittal date should be printed in the lower right corner <br />of each revision page. A cover letter to the revision should explain the nature of the revision and reference the specific permit <br />sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list (except <br />OSM) at the same time the application is submitted to the Division, and proof of distribution must be submitted to the <br />Division along with the application. Copies of revision pages modified during the review process must be distributed in the <br />same manner, along with proof of distribution. Proof of distribution must be submitted prior to implementation of the <br />revision. RECEIVED <br />Permit No.: C- 2009 -087 Date: October 3, 2012 <br />QC1 <br />Permittee: Peabody Sage Creek Mining, LLC <br />j zzo�z <br />Street: 36600 RCR 27 Divi5 l©r9 & S alety , <br />Nhr�in� [ i?~ :tety <br />City: Hayden <br />State: Colorado Zip Code: 81639 <br />Brief Description of Revision: Response to ARR Bonding Acreages Discrepancies <br />Public Notice Attached: Yes _ No X (Required for PRs and TRs) ,.. <br />Bond Increase: Yes . No X Federal X Non - Federal Mine <br />Proposed Change in: <br />Permit Area - <br />Disturbed ( + / -) 0.0 Acres <br />Permit ( + / -) 0.0 Acres <br />Affected ( + / -) 0.0 Acres <br />Surface Ownership - Mineral Ownership - <br />Surface Private ( + / -) 0.0 Acres Mineral Private ( + / -) 0.0 Acres <br />Surface Federal ( + / -) 0.0 Acres Mineral Federal ( + / -) 0.0 Acres <br />Surface State ( + / -) 0.0 Acres Mineral State ( + / -) 0.0 Acres <br />f+. <br />
The URL can be used to link to this page
Your browser does not support the video tag.