Laserfiche WebLink
PART II <br />Page No. 18 <br />Permit No. COG-850000 <br />• NOTIFICATION REQUIREMENT'S <br />7. Upsets <br />a. Effect of an Upset. <br />An upset constitutes an affirmative defense to an action brought for noncompliance with permit effluent limitations if <br />the requirements of pazagraph (b) of this section arc met. No determination made during administrative review of <br />claims that noncompliance was caused by upset, and before an action for noncompliance, is final administrative <br />action subject to judicial review. <br />b. Conditions Necessary for a Demonsration of Upset <br />A permittce who wishes to establish the affumazive defense of upset shall demonstrate through properly signed <br />contemporaneous operating logs, or other relevant evidrnce that: <br />i. An upset occurred and that the permittce can idrntify the specific cause(s) of the upset; and <br />ii. The permitted facility was at the time being properly operated and maintained; and <br />iii. The permittce submitted proper notice of the upset as required in Part II.A.4. of [his perrnit (24-hour notice); <br />and <br />iv. The permittce complied with any remedial measure necessary to m+~~mizr or prevent any discharge or sludge <br />use or disposal in violation of this permit which has a reason able likelihood of adversely affecting human health <br />or the environment. <br />• In addition to the demonstration required above, a permittce who wishes to establish the affirmative defense of upset <br />for a violation of efflurnt limitations based upon water quality standards shall also demonstrate through monitoring, <br />modeling or other methods that the relevant standards were achieved in the receiving water. <br />c. Burden of Proof <br />In any enforcement proceeding the permittce sceking to establish the occurrence of an upset has the burdrn of proof. <br />8. Discharee Point <br />Any discharge to the waters of the State from a point source other than specifically authorized by this permit is <br />prohibited. <br />9. Procer Oceration and Maintenance <br />The permittce shall az all times properly operate and maintain all facilities and systems of treatment and control (and <br />related appurtenances) which are installed or used by the permittce as necessary to achieve compliance with the <br />wnditions of this permit. Proper operation and maintenance includes effective performance and adequate laboratory and <br />process controls, including appropriate quality acenrance procedures. This provision requires the operation of back-up or <br />auxiliary facilities or similar systems which are installed by the permittce only when necessary to achieve compliance <br />with the conditions of the permit. <br />10. Minimisation of Adverse Impact <br />• The permittce shall take all reasonable steps to *~inim;~r dr prevem any dischargc of sludge use or disposal in violation <br />of this permit which has a reasonable likelihood of adversely affecting human health or the environment. As necessary, <br />accelerated or additional monitoring to determine the nature and impact of the noncomplying discharge is required. <br />