Laserfiche WebLink
October 8, 2012 <br />Tom Kaldenbach <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street Room 215 <br />Denver, CO 80203 <br />RE: Technical Revision #9 and Surety bond adjustment request for Alma Placer Mine (Permit <br />,1 i- 1985 -029) <br />Tom: <br />X Greg Lewicki And Associates, PLLC <br />11541 Warrington Court Phone: (303) 346 -5196 Fax (303 )-346 -6934 <br />Parker, CO USA 80138 E -Mail: info(a Iewicki.biz <br />This TR request is to allow for a new mill building to replace the old one on site, and allow this <br />building to remain after reclamation since it will conform to the post- mining land use. Also, <br />adjustment is needed due to a significant amount of plants and equipment that have been <br />removed from the site. The permittee is High Mountain Mining Co, LLC. <br />The revised permit pages are enclosed, as well as the bond adjustment calculations, according to <br />Rule 4.14 for the Alma Placer Mine. No changes for the gravel portion of the operation are <br />addressed at this time, however, there will likely be a reduction there since many of the plants <br />have been removed. A comparison of the bond changes is given below: <br />Gold Operation: Current bond: $106,899. Proposed amount: $126,803 <br />Bond Increase: $19904. The check for the TR fee of $216 and the check for the bond increase <br />are enclosed. The form for the <br />Please call me if you have any questions. <br />Sincerely, <br />Greg Lewicki, P.E. <br />Greg Lewicki and Associates <br />CC: Jim Murray <br />CC: Bob Willits <br />)1° <br />< <br />)1/ # " <br />7 <br />OCT 092012 <br />Mining & Safety <br />