Laserfiche WebLink
Mr. G. Russell Means <br />October 1, 2012 <br />Page 2 <br />lease for lease tract C- JD -7A, which is subject to the District Court's October 18, 2011 <br />injunction, as amended. Cotter is therefore relieved of any obligation to conduct exploration, <br />drilling and mining on lands covered by such lease. Under these circumstances, no additional <br />active mining activities have occurred at the JD -7 Pit during the period covered by your request. <br />In numbered paragraph 2) of your January 24, 2012 letter, you do not request that Cotter provide <br />additional information, since the Division has previously granted intermittent status for the JD -7 <br />Pit. No additional information responsive to numbered paragraph 2) is therefore set forth in this <br />letter. <br />In numbered paragraph 3) of your January 24, 2012 letter, you request that Cotter provide to the <br />Division: <br />(a) "A detailed and specific narrative description of the condition of the <br />operation at the time it entered [intermittent status], supplemented with maps; <br />along with a detailed and specific narrative description of the current condition of <br />the operation, supplemented with maps." <br />(b) "If your Mine is a Designated Mining Operation ( "DMO "): any and all <br />documentation necessary to comply with the EPP requirements associated with <br />that legal designation...." <br />(c) "A detailed and specific narrative description of your plans for resumption <br />of mining." <br />With respect to the requests set forth in subparagraph a), the condition of the "operation" when it <br />entered intermittent status is set forth in Cotter's letter, dated February 13, 1991, to the Division. <br />In that letter, Cotter requested that the Division re- classify the JD -7 Pit as an intermittent <br />operation, and provided information to support such request. By letter dated April 1, 1991, the <br />Division informed Cotter that the Board had approved Cotter's technical revision application. <br />The current condition of the "operation" is set forth in Cotter's application amendment, dated <br />September 2012, for the JD -7 Pit. A map of the JD -7 Pit showing the status of the mine <br />workings as of the time it was put into intermittent status is attached to this letter as Figure 1. A <br />map of the JD -7 Pit showing the current status of the mine workings is attached to this letter as <br />Figure 2. Cotter considers Figures 1 and 2 to contain "confidential commercial, financial, <br />geological, or geophysical data" and other information protected under C.R.S. §§ 24-72 - <br />204(3)(a)(iv) and 24- 72- 204(3)(a)(xxi). Accordingly, Cotter respectfully requests that the <br />Division not produce Figures 1 and 2 in response to any request for disclosure made under the <br />Colorado Open Records Act, C.R.S. §§ 24 -72 -200.1 to -206. <br />With respect to subparagraph b), the JD -7 Pit is a DMO. The documentation necessary to <br />comply with the Environmental Protection Plan ( "EPP ") requirements for the JD -7 Pit is <br />contained in Exhibit U to Cotter's application amendment, dated September 2012, for such mine <br />