My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-10_REPORT - M1977348
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977348
>
2012-10-10_REPORT - M1977348
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:20 PM
Creation date
10/10/2012 3:04:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977348
IBM Index Class Name
REPORT
Doc Date
10/10/2012
Doc Name
ANNUAL FEE/REPORT
From
HOLCIM
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Manufacturing Performance Center <br />October 5, 2012 <br />Mr. Jim Dupler <br />Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street Room 215 <br />Deriver, CO 80203 <br />Holcim Inc. <br />3500 State ate Hwy 120 <br />t\Floicini Florence, CO 81226 <br />Re: Holcim (US) Inc., Boettcher Limestone Quarry, Permit M- 1977 -348 <br />Dear Mr. Dupler, <br />Phone 719 - 784 -6325 <br />Fax: 719- 784 -3470 <br />www.holcim.com /us <br />3 <br />Attached please find a check in the amount of $791.00 for the Limestone Boettcher Quarry to <br />cover the annual fee for the period from October 10, 2011 to October 10, 2012. <br />The Limestone Boettcher has been in a status of final reclamation. Final reclamation has been <br />completed and is pending release due to some water issues. Activities on the site have been as <br />follows: <br />1. Weed control in coordination with Larimer County Weed Department (Weed Control is in <br />progress per attached proposal. Will forward final report once completed). <br />2. Monitoring and sampling water wells on the property. <br />3. Monthly Inspections and monitoring the reclamation. <br />In addition, Holcim is working with the State Engineers office regarding some ponding and <br />surface water issues at the site. Holcim will be submitting an application for a well permit as well <br />as an Augmentation Plan. <br />Should you have any questions or need any additional information, please do not hesitate to call <br />me at (719) 784 -1402 or on my cell phone at (719) 429 -5566. <br />Sincerely, <br />Michael B. Toelle <br />Sr. Mining and Raw Material Specialist <br />Holcim (US) Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.