Laserfiche WebLink
•GCC <br />as submitted. GCC Energy respectfully requests that the due date of time for <br />relocation and /or reconstruction of the coal mine waste on the portal bench be <br />extended to November 30, 2012. <br />Please call Tom Bird at (970) 385 -4528 x 6503 if you have any questions or comments. <br />Tom Bird <br />Manager, Coal Services <br />GCC Energy, LLC <br />"Safety as a Value" <br />Telephone. 970.385.4528 <br />Facsimile: 970.385.4638 <br />GCC Energy, LLC <br />6473 County Road 120 <br />Hesperus, Co 81326 <br />