My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-05_ENFORCEMENT - C1981035 (3)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981035
>
2012-10-05_ENFORCEMENT - C1981035 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:12 PM
Creation date
10/10/2012 8:04:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
ENFORCEMENT
Doc Date
10/5/2012
Doc Name
Request for Extension of Abatement Beyond 90 Days
From
Marcia Talvitie
To
Loretta Pineda
Violation No.
CV2012003
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loretta Pineda <br />October 5, 2012 <br />Page 2 of 2 <br />On August 14, 2012, in fulfillment of Abatement Step #1, GCC submitted an application for <br />Technical Revision No. 20 (TR -20). The TR -20 application included the Trautner and CDS <br />reports, but specific details regarding the proposed final configuration for placement of coal mine <br />waste were not provided. The Division found the TR -20 application to be incomplete on August <br />22, 2012, and GCC is working to complete the necessary designs for the coal mine waste to meet <br />the performance standards criteria. TR -20 will provide plans for underdrains, slope stability, <br />final grade, final revegetation and other standards as required. GCC will work with contractors <br />to ensure the coal mine waste on the portal bench will either be relocated to the approved refuse <br />pile or rehandled so that the material will achieve all performance standards. <br />Current Request <br />GCC continues to diligently work toward abatement of the NOV as discussed in the attached <br />letter, and has submitted a request for extension of Abatement Step #2 to November 30, 2012. <br />GCC has committed to the relocation and /or reconstruction of the coal mine waste on the portal <br />bench and portal highwall being completed by November 30, 2012. However, Rule <br />5.03.2(2)(c)(g) limits an extension to 90 days. Therefore, I recommend that the final abatement <br />deadline be set at November 30, 2012. <br />If you have any questions, please contact me. <br />
The URL can be used to link to this page
Your browser does not support the video tag.