Laserfiche WebLink
Gold Eagle Mining Inc. <br />Ellison Mine Permit Number M -1978 -342 <br />active mines. However, inactive mines are often used by bats as either winter <br />roost sites or summer breeding areas. During reclamation of the Ellison Mine <br />measures will be taken to provide access to the mine for bats after closer. <br />18.0 Disposal of Tailings and Sludge <br />Underground disposal of tailings and sludges in the Ellison Mine is not anticipated <br />at this time. The current mining plan for the Ellison Mine does not anticipate the <br />processing of ore at the mine site. <br />Exhibit U -9 <br />