Laserfiche WebLink
� N <br />�r <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the Drain Cover <br />Processing area. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />Two samples of DCF were obtained for laboratory testing during the week. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue slope contouring and subgrade preparation within the Mill Site Earthworks project. <br />Continue subgrade acceptance prior to SLF placement. <br />Continue SLF placement. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC &V: <br />CC &V held a weekly construction meeting on September 25, 2012. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames: <br />None <br />AMEC: <br />Daily toolbox safety meeting were attended by AMEC personnel. <br />Summary of Incidents /Accidents /Health & Safety Issues: <br />None <br />We trust the information provided clearly rep <br />September 29, 2012. n <br />Joseph Hickey, CQA Mon <br />Approved By: <br />our findings and observations for the week ending <br />Date: September 29, 2012 <br />Date: � -4 <br />MEW Weekly Report WE 09.29.2012 <br />