Laserfiche WebLink
REASON FOR INSPECTION: <br />Normal I &E Program <br />BOND CALCULATION TYPE: <br />Complete Bon. <br />BOND AMOUNT: <br />$20,241.00 <br />DATE OF COMPLAINT: <br />NA <br />POST INS ' 0 NTACTS: <br />None <br />JOINT INSP. AGENCY: <br />None <br />WEATILER: <br />Clear <br />INSP ' ' OR' SI ATURE: <br />Q _ <br />SIGNATURE DATE: <br />October 5, 2012 <br />MINE NAME: <br />Challenger Pit <br />MINE/PROSPECTING ID#: <br />M- 1985 -026 <br />MINERAL: <br />Sand and gravel <br />COUNTY: <br />Weld <br />INSPECTION TYPE: <br />Monitoring <br />INSPECTOR(S): <br />Peter S. Hays <br />INSP. DATE: <br />September 26, 2012 <br />INSP. TIME: <br />11:00 <br />OPERATOR: <br />Coulson Excavating Company, Inc. <br />OPERATOR REPRESENTATIVE: <br />None <br />TYPE OF OPERATION: <br />112c - Construction Regular Operation <br />QOvcoto COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />y t:, MINERALS PROGRAM INSPECTION REPORT <br />\e7s' <br />PHONE: (303) 866 -3567 <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Backfilling & Grading <br />PROBLEM /POSSIBLE VIOLATION: Problem: The lake slopes are steeper than the required 3H:1V slopes from 5 <br />feet above to 10 feet below the expected water line as required by Rule 3.1.5(7) and as per the approved <br />Reclamation Plan for the site for sections of Pond 1 and 3. <br />CORRECTIVE ACTIONS: The Operator must demonstrate the slopes are in compliance with the approved <br />reclamation plan or re -grade the out of compliance lake shoreline slopes to the required horizontal to vertical <br />ratio and notify the Division the grading work is completed, provide topographic survey evidence of the grades <br />and contact the Division for a follow -up inspection. <br />CORRECTIVE ACTION DUE DATE: 12/04/12 <br />INSPECTION TOPIC: Hydrologic Balance <br />PROBLEM /POSSIBLE VIOLATION: Problem: The Division has no evidence that the Operator has a valid well <br />permit, substitute water supply plan, or approved water augmentation plan for the exposed groundwater at <br />the site. This is a problem related to 34- 32.5- 116(4)(h) of the Colorado Revised Statutes and 3.1.6(1)(a) of the <br />Construction Materials Rules and Regulations governing injury to existing water rights. <br />CORRECTIVE ACTIONS: The Operator shall demonstrate that the operation is in compliance with the Office of <br />the State Engineer, show evidence that the Operator is taking measures to bring the site into compliance with <br />the SEO, or backfill the pits to at least two feet above the groundwater surface by the corrective action date <br />specified. <br />CORRECTIVE ACTION DUE DATE: 11/05/12 <br />Page 1 of 7 <br />