Laserfiche WebLink
COLD OADO <br />RECLAMATION <br />MINING <br />SAFETY <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />COAL MINING PERMIT - TECHNICAL REVISION DECISION <br />Bowie No. 1 Mine, Bowie Resources, LLC <br />Permit No. C- 1981 -038 <br />The Division of Reclamation, Mining and Safety has proposed the decision stated below. Provided there <br />are no objections, the decision will become effective upon the termination of the ten (10) day public <br />comment period, in accordance with Rule 2.08.4(6)(b)(iii). <br />Technical Revision No. 54 Decision: Approve <br />Submittal Date: August 16, 2012 Decision Date: October 9, 2012 <br />Description of Revision: Change the channel lining and riprap size in reclaimed Ditch 7. <br />REVISED INFORMATION <br />APPLICATION PAGES <br />MAPS /EXHIBITS <br />Volume 6A, pages 6a -6e <br />None <br />DELETED ITEMS <br />CHANGE IN <br />REVISED <br />ACREAGE <br />TOTAL ACREAGE <br />PERFORMANCE BOND <br />Disturbed: 0.00 <br />Disturbed: <br />154.90 <br />Prior Liability: <br />$4,718,106.31 <br />Affected: 0.00 <br />Affected: <br />2,998.00 <br />Change in Liability: <br />$0.00 <br />Permit: 0.00 <br />Permit: <br />5,431.00 <br />Revised Liability <br />$4,718,106.31 <br />State: 0.00 <br />State: <br />0.00 <br />Bond Held <br />$5,761,290.00 <br />Federal: 0.00 <br />Federal: <br />1,466.00 <br />Private: 0.00 <br />Private: <br />3,965.00 <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Authorized Representative <br />Date: October 9, 2012 <br />