Laserfiche WebLink
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7TH STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />MINE ENGINEERING CIVIL ENGINEERING <br />MINE RECLAMATION CONST. MANAGEMENT <br />October 3, 2012 <br />Mike Boulay <br />Division of Reclamation, Mining and Safety <br />101 South 3 Street Suite 301 <br />Grand Junction, CO 81501 <br />Re: CAM Mining, LLC, Munger Canyon Mine <br />Permit Renewal No. 6 <br />Permit No. C -1981 -020 <br />Dear Mr. Boulay: <br />On behalf of Cam Mining, LLC (CAM), the following responses have been prepared in reply to <br />the Division of Reclamation, Mining and Safety (DRMS)' comments and concerns regarding the <br />above - referenced permit renewal, stated in their letter dated July 16, 2012 . <br />1. The Division did a review of the OSM Applicant Violator System (AVS) versus the permit <br />application for Munger Canyon Mine. The information in AVS is more current than in the <br />permit application package (PAP). Please revise Appendix A Identification of Interests to <br />include current ownership and control information for CAM Mining, LLC and its owners and <br />controllers. <br />CAM - Attached are amended Appendix A pages 1 through 14. These pages replace the <br />entire Appendix A in the permit. <br />2. The reclamation schedule and costs should be updated (Section 3.8 and Table 3.9 -6) of <br />the PAP. Based on our review of the PAP, Annual Reclamation Reports, and the Phase I <br />Findings the Division provides the following summary of the reclamation status of the <br />Munger Canyon Mine site and the remaining reclamation work to be completed. <br />CAM - Enclosed is a revised Table 3.9 -6. <br />Sincerely, <br />J. E. Stover, P.E. <br />Consulting Engineer <br />Cc: Denver Office 1 Copy <br />BLM <br />Enclosures: Appendix A Pages 1 - 14, Page 3 -20, Table 3.6 -9 <br />RECEIVED <br />OCT 092012 <br />Division of Reclamation, <br />Mining & Safety <br />