Laserfiche WebLink
TR -18 to Permit M- 1977 -342 <br />Environmental Protection Plan <br />Appendix A <br />Spill Prevention, Control, and Countermeasure / Materials Containment Plans and <br />Incident Response Manuals <br />Appendix B <br />Storm Water Management Plan <br />Appendix C <br />MSDS Sheets for Designated Chemicals <br />Appendix D <br />List of DRMS Permit Amendments <br />Appendix E <br />List of DRMS Technical Revisions <br />Appendix F <br />Ute Park Pump Station Alarm System (1991) <br />Appendix G <br />Geochemical analyses of waste rock used for railroad haulage construction (1995) <br />Appendix H <br />Quarterly Surface Water Quality Data <br />Appendix I <br />Figure 1: Mine Site Plan Showing Water Bodies and Sampling Locations <br />Figure 2: Mill Site Plan Showing Water Bodies and Sampling Locations <br />Figure 3: Henderson Mine EPF 1.1— Mine Water System <br />Figure 4: Henderson Mill EPF 1.1 and 1.2 — East Branch Reservoir System and Mill Process Water Storage Tanks <br />Figure 5: Henderson Mill EPF 1.3 — Tailings Delivery System <br />Figure 6: Henderson Mill EPF 1.4 — Tailings Storage Facility <br />Figure 7: Henderson Mill EPF 1.5 and 1.6 — Seep water Collection /Return and Groundwater Intercept System <br />Figure 8: Henderson Mill EPF 1.7 — Ute Park Pump Station <br />Figure 9: Henderson Mill EPF 2.1 through 2.9 — Designated Chemicals Storage <br />Figure 10: Henderson Mill EPF 3.1— Storm Water Diversion System <br />Figure 11: Henderson Mine EPF 1.2 — Storm Water Diversion System <br />Climax Molybdenum Company <br />Henderson Operations <br />List of Appendices <br />October, 2012 <br />Page iii of v <br />