My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-05_REVISION - M1977342 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2012-10-05_REVISION - M1977342 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:14 PM
Creation date
10/9/2012 10:58:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
10/5/2012
Doc Name
Submittal- EPP, Cover to Material Safety Data- CYTEC
From
Climax Molybdenum Co.
To
DRMS
Type & Sequence
TR18
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR -18 to Permit M- 1977 -342 <br />Environmental Protection Plan <br />12. WATER QUALITY MONITORING PLAN <br />The water treatment and discharge systems are permitted as discussed previously (CDPS Permit <br />CO- 0041467 for the Mine; CO- 0000230 for the Mill). These permits require extensive <br />monitoring. Detailed information regarding the types of monitoring, parameters, frequency, <br />reporting requirements, methods and analyses are found in these permits. The Henderson Mine <br />and Mill stream and groundwater sampling locations are presented in Figures 1 and 2 and <br />summarized in Tables 12 and 13. These include locations that are currently monitored as part of <br />the approved GWMP. <br />The CDPS Permit (No. CO- 0000230) identifies one Outfall (004A) at the Henderson Mill site <br />which would require monitoring should a discharge or bypass of process water be authorized. <br />Since the mill operates in a closed system, monitoring only is required in the event of a <br />discharge. Detailed information regarding the types of monitoring, parameters, frequency, <br />reporting requirements, methods and analyses is found in that permit. <br />TR -16 stipulates additional monitoring as discussed in section 9.0 and 11.0 above. <br />Climax Molybdenum Company <br />Henderson Operations <br />October, 2012 <br />Page 32 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.