Laserfiche WebLink
r <br /> -18- <br /> (3) The division shall require such monitoring of surface and <br /> groundwater quality, both on and off the site, as it deems <br /> necessary to determine compliance by permittees with the water <br /> quality provisions of this article. <br /> B. NOV C-84-104 <br /> 1 . Failure to properly monitor surface and ground water. <br /> Specifically, failure to monitor ground water at the Rock <br /> Tunnel Waste Disposal site between November, 1983 and May, 1984 <br /> and failure to monitor discharge points for oil and grease <br /> according to the NPDES permit. <br /> 2. Location - The Rock Tunnel Waste Disposal Site Ground Water <br /> Monitoring Station and all NPDES discharge points at the mining <br /> operation. <br />