Laserfiche WebLink
-3- <br /> for the underground mining activities have been issued <br /> by the appropriate authorities. <br /> (D) The areas proposed for the variance have been shown by <br /> the applicant to be necessary for the proposed <br /> underground mining; <br /> (E) No substantial adverse environmental damage, either <br /> on-site or off-site, will result from the delay in <br /> completion of reclamation as required by this article; <br /> (F) Provisions for the off-site storage of spoil will <br /> comply with paragraph (v) of this subsection (2); <br /> (II) If the board has promulgated specific regulations to <br /> govern the granting of such variances in accordance <br /> with the provisions of this article; <br /> (III) If variances in accordance with the provisions of this <br /> paragraph (p) are to be reviewed by the division not <br /> more than three years from the date of issuance of the <br /> variance; and <br /> (V) If liability under the bond filed by the applicant with the <br /> division pursuant to section 34-33-113(2) will continue for <br /> the duration of the underground mining activities and until <br /> the requirements of this subsection (2) and section <br /> 34-33-125 have been fully complied with. <br /> B. NOV C-84-089 <br /> 1 . Failure to ensure that reclamation efforts proceed in an <br /> environmentally sound manner. Specifically, improper disposal <br />