My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (193)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (193)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:06:48 AM
Creation date
10/5/2012 9:22:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br /> for the underground mining activities have been issued <br /> by the appropriate authorities. <br /> (D) The areas proposed for the variance have been shown by <br /> the applicant to be necessary for the proposed <br /> underground mining; <br /> (E) No substantial adverse environmental damage, either <br /> on-site or off-site, will result from the delay in <br /> completion of reclamation as required by this article; <br /> (F) Provisions for the off-site storage of spoil will <br /> comply with paragraph (v) of this subsection (2); <br /> (II) If the board has promulgated specific regulations to <br /> govern the granting of such variances in accordance <br /> with the provisions of this article; <br /> (III) If variances in accordance with the provisions of this <br /> paragraph (p) are to be reviewed by the division not <br /> more than three years from the date of issuance of the <br /> variance; and <br /> (V) If liability under the bond filed by the applicant with the <br /> division pursuant to section 34-33-113(2) will continue for <br /> the duration of the underground mining activities and until <br /> the requirements of this subsection (2) and section <br /> 34-33-125 have been fully complied with. <br /> B. NOV C-84-089 <br /> 1 . Failure to ensure that reclamation efforts proceed in an <br /> environmentally sound manner. Specifically, improper disposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.