Laserfiche WebLink
f Failure to maintain and construct haul roads with proper materials. <br /> Specifically, utilizing material containing coal for road base. <br /> The Mines 1 and 2 haul road system. Specifically, that portion of the haul <br /> road between the Mine No. 2 bin pad an the Mine No. 1 bin. <br /> l <br /> i� <br /> Failure to properly maintain the haul road drainage system. <br /> o��X COC'A, -- The Mine No. 5 haul road. <br />