My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-10-26_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1989-10-26_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2021 6:05:14 PM
Creation date
10/5/2012 9:22:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
10/26/1989
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` <br /> MEIP SUPPLEMENT Page 5 <br /> when the snow melts off of the mine road. <br /> T�ie upper , tunnel dump pond in the main yard area near the ro' � <br /> d,si hio� was recently clpo/`p'| with the Px, rpti' `n of un/' inaccp=sib] e <br /> corner that will have t^ he picted up with a bar|'hve. They intend to <br /> pu] l ''ut i|`p bins in the near rowe which 9hould opp" up the area <br /> [' '/ ms ' o| pn'm''e. <br /> Porsha] ] [] ump reading, were noted whj ] p in thp area, . 13 on th� <br /> in [low side and , 4R At ihp bntl ' 'm. <br /> Topsoil removal operations on the Sutpy Waste pile is t, begin next <br /> week. Some of the soil will be live handled to the outslope for <br /> reclamation and the rest stored in the new storage area. (TDN ) <br /> The uoxdprdrain opening ' '" the disp' 'sal arpa was covered and <br /> proterted. Fl ^w was n^tp'1 entering and pxiting the strurture. <br /> A spring has developpd on the m/ter pprio/pter acnens road of the <br /> wnnte pile. It should he mo, it'`red. An .x1.1iti ' 'nal seep was "lso <br /> noiRd ' .n thp upppr limits ' 'f the base ''f the pile ' 'n the sout|wer1 <br /> aide that shu/Jd alqv be m''niLore']' If opcessary, it should hp <br /> opened "p and an underdrain installed for drainage. <br /> An ndditim.',l 1 , 100 rent ' ' [ ' ' '//vry' 'r belt iF bping innkallpJ on 1he <br /> waste pi ) p fm the new extpnsion . <br /> The firs| sediment pond in the series below the Subey pile wa�: <br /> cleaned last month. The dpwa| ering valve on the lower pond needs Q, <br /> he resealm'|, <br /> Th- perjmetpr flown of dist"rbed area water off of the "D" bed C ' ^Ol <br /> stockpile pad should bp consolidated. Several nich pain( s werp noLed <br /> along the edge of the pad which should be controlled to limit the <br /> sediment loading of the downstream treatment ponds. <br /> Thewarehouse ponds were cleaned last week, no discharge was noted <br /> And the spillways were functional . <br /> The ] ow-r bus garage pond was cleaned and no discharge was <br /> occuriog . The spillway hptween the lower one and tk- secondary was <br /> leaking, hentonite was used during the inspection to correct the <br /> situation . � <br /> The thickner pond was cleaned out within the last two weeks. <br /> The picnic [,md Epillways needed maintenance, nnn of the three 24 <br /> inch Ft�onds~ys was partially nollppsPd ond the_ primary was Hocked <br /> partially with dirt on thp downstrnam p"d . The comment was made ! hat <br /> the system had never discharged since coostru' tion. Mention was made <br /> i|/at the hydrological Calculations for the system should be revjewcd <br /> In s-e ir it was sized properly if not the spillways could be <br /> / edRsigned . In the meantime, they were reworked duoing the <br /> inspecti ' 'r.. <br /> The greywater pond was being cleaned with a draglzne during the <br /> inspection. No discharge was noted and the spillways appeared <br /> functional . <br /> The qu-sii 'nn was raised about the lac|. of or a need for an <br /> emp'gpncy spillway on the north pond on the old waste pile, It Was <br /> not resnlve'] o//d should he foll ' 'wed up on. Notations will be made t'� <br /> Lhis report a" the issue is spttled. An addendum will be mad� <br /> arcording] y' <br /> The company has o 'mmitted to resoili /`g the old rp [use pjlr' on a <br /> ihrpe acre per year basis. This should be verified for Pnforumo.onf- <br /> p'" ['vsps. Overf] ight rpu. .rds could be used to identify their <br /> ef [orts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.