Laserfiche WebLink
Concerning NOV C-88-022 I have sized a 100yr/24hr ditch for <br /> the site. We are in the process of obtaining equipment to <br /> construct this ditch. In order to keep up with placement of <br /> the refuse until the conveyor extension can be built, we <br /> have put two D-8's on the pile. The details of this plan <br /> will be submitted under separate cover as required for <br /> abatement of the NOV. <br /> Sincerely, <br /> Scott Jones, P.E. <br /> Environmental Engineer <br /> cc: Mr. Ed Mulhall <br />