My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983-11-22_ENFORCEMENT - C1981017
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981017
>
1983-11-22_ENFORCEMENT - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 9:10:30 AM
Creation date
10/5/2012 9:22:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Enforcement
Doc Date
11/22/1983
Doc Name
Bid Documents (IMP) CV-83-027
Violation No.
C-83-027
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORAOO RICHARD D. LAMM. Governor <br /> DEPARTMENT OF NATURAL RESOURCES <br /> D. Monte Pascoe,Executive Director <br /> ILN ED LAND RECLAIMATIOiV <br /> 423 Centennial Building,1313 Sherman Street <br /> - Denver, Colorado 80203 Tel. (303) 866-3567 <br /> David C. Shelton <br /> Director <br /> SETTLEMENT AGREEMENT <br /> MINE NAME: COAL BASIN MINES <br /> PERMITTEE: Mid-Continent Resources , Inc. <br /> MAILING ADDRESS: P.O. Box 158, Carbondale, Colorado 81623 <br /> OPERATOR (If Other Than Permittee) : <br /> MAILING ADDRESS: <br /> COUNTY: Pitkin & Gunnison TYPE OF MINE: Jlnrlergraland <br /> PERMIT NO. : C-017-83 VIOLATION NO. : NOV 83-13 <br /> The Mined Land Reclamation Division ("the division") issued a certain notice of <br /> proposed amount of civil penalty, and the operator requested a conference theron, as <br /> authorized by C.R.S. 1973, 34-33-123(8) . The requested conference having been held <br /> as required by law, the Division and the operator hereby agree as follows : <br /> 1. The amount of the penalty shall be $ 550.00 ; <br /> 2. The penalty shall be paid to, the Division by the, operator not later than 30 <br /> days from the date hereof; <br /> 3. Payment of such penalty by the operator shall constitu.e a waiver of all fur- <br /> ther rights to review of such penalty or of the violation on which it is based. <br /> This agreement shall not be effective unless signed by the operator within ten days <br /> after the closing date of such conference,which date is set forth below opposite the siq- <br /> nature of the conference officer. If not so signed, the Division will fix the penalty at <br /> whatever amount it deems appropriate based upon the factors referred to in C.R.S. 1973, <br /> 34-33-123-(8)(d) . <br /> DATE: OPERATOR: <br /> BY: <br /> DI JSICN OF MINED LAND R AMATION <br /> DATE: JA"I J 3 BY: <br /> u C <br /> �onference C. hWi on <br /> 2/81 C.R.S. 1973, 34-33-123(8)(c)(d) <br /> Attachment •i <br />
The URL can be used to link to this page
Your browser does not support the video tag.