Laserfiche WebLink
Trapper Mining Inc. <br />Third Quarter 2012 <br />Impoundment Inspection - Pond Capacity Data <br />Pond ID <br />Oak #2 <br />West Flume <br />Middle Flume #1 <br />Middle Flume # 3 <br />East Middle Flume <br />East Flume <br />Deer <br />Ute <br />Horse <br />West Horse <br />Deal <br />Impoundment H <br />Principle. Spillway <br />Stage (ft.) <br />9.5 <br />Total Capacity <br />to PS stage <br />(acre -feet) <br />0.93 <br />60% Sediment <br />Capacity <br />(acre -feet) <br />0.56 <br />60% Sediment <br />Capacity Stage <br />(ft.) <br />7.7 <br />Remaining <br />Design Capacity <br />(acre -feet) <br />0.37 <br />Inspection <br />Observation <br />(% sediment) <br />0.00 <br />10.0 2.35 1.41 7.8 0.94 30.00 <br />11.7 0.80 0.48 9.0 0.32 0.00 <br />14.0 3.36 2.02 10.5 1.34 0.00 <br />13.0 2.56 1.54 9.2 1.02 0.00 <br />11.3 1.18 0.71 8.5 0.47 10.00 <br />6.0 0.24 0.14 5.0 0.10 0.00 <br />7.0 1.72 1.03 5.2 0.69 10.00 <br />13.3 6.20 3.72 10.3 2.48 40.00 <br />13.0 2.00 1.20 9.7 0.80 0.00 <br />16.8 2.00 1.20 15.1 0.80 0.00 <br />9.5 4.82 2.89 4.9 1.93 0.00 <br />Qtr. 3 Estimated <br />Sediment <br />(acre -feet) <br />0.00 <br />0.71 <br />0.00 <br />0.00 <br />0.00 <br />0.12 <br />0.00 <br />0.17 <br />2.48 <br />0.00 <br />0.00 <br />0.00 <br />( lk <br />lows- -I <br />Qtr. 3 Approximate <br />Rem. Capacity <br />(acre -feet) <br />0.93 <br />1.65 <br />0.80 <br />3.36 <br />2.56 <br />1.06 <br />0.24 <br />1.55 <br />3.72 <br />2.00 <br />2.00 <br />4.82 <br />