Laserfiche WebLink
October 2, 2012 <br />1.0 <br />Introduction <br />Horse Gulch Fill Quarterly Inspection Report <br />Third Quarter 2012 <br />Table of Contents <br />2.0 Critical Construction Periods <br />2.1 Removal of All Organic Material and Topsoil <br />2.2 Placement of Underdrainage Systems <br />2.3 Installation of Surface Drainage Systems <br />2.4 Placement and Compaction of Fill Materials <br />2.5 Revegetation <br />3.0 <br />References <br />I certify that this report was prepared by me. <br />61l42_ <br />Tonia Marie Perkins <br />CO PE 43864 <br />Mining Engineer <br />Trapper Mining, Inc. <br />2 <br />3 <br />3 <br />3 <br />3 <br />5 <br />6 <br />6 <br />1 <br />