Laserfiche WebLink
October 2, 2012 <br />Dear Ms. Burgmaier: <br />Sincerely, <br />zC ' /)7 L- 1 <br />Tamme Bishop, P.E. <br />Project Engineer <br />cc: Basil Bear <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7 STREET, UNIT <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />MINE ENGINEERING <br />MINE RECLAMATION ST. ENGINEERING <br />CONST. MANAGEMENT <br />Susan Burgmaier <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 RECEIVED <br />Re: Bowie No. 1 Mine OCT 0 4 2012 <br />Technical Revision No. 54, Adequacy Response #1 <br />Revise channel lining for reclaimed Ditch 7 Division of r eclamOil @fi, <br />Permit C- 1981 -038 Mining & Safs:?y <br />During a site inspection last week, DRMS suggested to Bowie Resources, LLC (BRL) that instead of <br />installing a grouted riprap channel, a better graded riprap would be an acceptable alternative in <br />Ditch 7. BRL agreed to install a better graded riprap, and therefore the design has been amended. <br />On behalf of Bowie Resources, LLC, enclosed are pages 6a, and 6e. <br />Please feel free to call me if you have any questions. <br />